phoi canh tru so 525

OVERVIEW

CIENCO 525

Civil Engineering Construction Joint-Stock Company No. 525 (abbreviated as CIENCO 525) was equitized from Construction Company 525 under the Transport Construction Corporation 5 - Ministry of Transport under Decision No. 4029/QD - BGTVT dated December 26, 2002 of the Minister of Transport.

After almost 60 years of formation and development, the company is showing its mettle of a heroic unit during the resistance war and national reconstruction and rehabilitation. CIENCO 525 has completed more than 1,000 projects of technical infrastructure, traffic, and wharf across the country. Possessing thousands of skilled engineers and workers, our heroic enthusiasm and bravery has made large-scale and high-quality projects including Song Gianh overpass (Quang Binh), Ben Thuy II bridge (Nghe An-Ha Tinh), Song Cai bridge (Da Nang), Kieu bridge (HCMC), bridge on Ho Chi Minh City - Trung Luong highway, bridges on National Highway 1A My Thuan -
Can Tho, Cao Lanh bridge (Dong Thap), Tra Lot bridge (Tien Giang), the bridge of Lo Te - Rach Soi route (Kien Giang), Song Hieu bridge (Quang Tri), Thi Vai international port (BRVT), Tien Sa port (Da Nang), etc

In addition to its rich experience and strong financial ability, CIENCO 525 owns numerous modern and integrated equipment including balanced cantilever rig, large diameter bored pile drill truck that can deploy drills in any geological conditions, cable tensioning equipment (front and back), Formwork system of all
kinds and beams, etc. CIENCO 525 can construct continuous cantilever bridges with spans from 60 meter to 150 meter and width up to 20m, or seaport works with a capacity of up to 20,000 DWT. We can construct all kinds of piles (with a diameter of up to 1.0m) and bored piles (with a diameter of 1.5m and a depth of up to 90m).
With advanced technology, modern construction equipment, experienced engineers, and enthusiastic and skilled workers, CIENCO 525 has participated in the construction of a large number of Bridge, Road and Ports project with large-scale technical infrastructure accross the country and many projects in the Lao
People's Democratic Republic.

Due to its merits and achievements in construction activities during the war as well as in the period of national construction and development, the Company was awarded by the State:

- The title of Hero of Labor (1972)
- The title of Hero of the People's Armed Forces (2009)
- The title of Independence Medal (2014)
- The title of the First Class Labor Medal (2007); Second Class (1992 and 1996) And many other certificates of merit, certificates of merit from competent agencies and ministries.

Currently, CIENCO 525 is a leader in the traffic construction industry. We are capable and ready to undertake the construction of large-scale and complex projects at home and abroad with the criterion of "Safety - Quality - Progress - Efficiency". We can meet all requirements of the Investor.

DEVELOPMENT STRATEGY

In the next 10 years, Company 525's development goals and orientation is to become the leader in road and bridge construction in Vietnam and can participate in transport infrastructure projects of Southeast Asia regional markets.
- By 2025: production and business value will increase 3 times compared to 2020.
- By 2030, the company will become Vietnam's leader in road and bridge construction, capable of participating as an investor in PP and BOT development projects in the field of road, railway and waterway transport infrastructure.
To achieve the above goals, the company will focus on the following key tasks:
- Building a team of skilled workers and engineers.
- Investing in procurement of modern and advanced equipment and technology in the field of construction of Bridge - Roads - Infrastructure – Ports.
- Investing in developing advanced management technology and digitization in all aspects of production and business activities.
- Investing and accumulating capital for production, business, investment and development.
- To list the company on the Stock Exchange before 2025
With the tradition of a heroic unit, with great determination, all managers and employees of the company will be able to complete development goals before the set deadline.

3

VISION

Constantly develop, contribute resources to projects of national stature, to become a professional contractor in the field of construction of bridges, roads and traffic Infrastructure with high quality and prestige in Vietnam

4

MISSION

Not only create high quality products and services to meet all the needs of customers, but also contribute to creating the values and potentials of new lands.

CORE VALUES

5

DYNAMICS

6

CREATIVITY

7

EFFICIENCY

8

PRESTIGE

10

PROFESSION

9

DEDICATION

5

Dynamics

CIENCO 525 upholds the spirit of positivity, initiative, dare to think, dare to do, the policy of building professional contractors in construction activities and real estate investors with the highest quality and reputation in Vietnam!
6

Creativity

CIENCO 525 considers creativity as vitality, a lever for development, constantly researching, innovating and pioneering in improvement and application of advanced technology and software such as (BIM TRACK, BIM ASSURE, BIM 360.. ...vv) into the process of construction and investment management projects.
7

Efficiency

CIENCO 525 considers work efficiency as an important and decisive factor when carrying out production, business and investment activities.
8

Prestige

CIENCO 525 puts the trust of customers on the top position, considers PRESTIGE as the decisive factor for success. Do your best to make sure the promise is true
10

Professional

CIENCO 525 constantly learns, exchanges expertise, strives to overcome difficulties and challenges and maintain stability in high-pressure work.
9

Dedication

CIENCO 525 puts the word TAM as the foundation, always upholds the rule of law, serves customers, serves the community, in order to give customers a satisfied, comfortable experience, a safe and happy living environment for the community. copper, population
Vector

PROGRESS OF

FORMATION & DEVELOPMENT

Vector

ORGANIZATIONAL CHART

Group 155 (5)
Vector

THE MANAGEMENT

BOARD OF DIRECTORS

hdqt-en-01.10.2024

THE MANAGEMENT

pgdd-en-new-01.10.2024
Vector

AWARDS

User

STRATEGIC PARTNERSHIP